The new five-level parking structure adds 814 transit parking spots at the Fullerton Transportation Center, which serves Amtrak and Metrolink passengers. In addition to the parking structure, a steel-mesh-covered pedestrian bridge was built with wide-flange steel beams and attached to the existing train-track bridge.
Project Details
Local Office:
Los Angeles, California
Owner:
City of Fullerton
General Contractor:
Bomel Construction Company
