The Metro Gold Line Foothill Extension Phase 1 was part of Los Angeles Metropolitan Transportation Authority’s effort to expand public transportation alternatives to the congested roadways of Los Angeles County. Phase 2A consisted of 11 miles of new railway and six Steel Girder Bridges that were fabricated in China and inspected by Smith-Emery to AWS D1.5 code.
Project Details
Local Office:
Los Angeles, California
Owner:
LACMTA
General Contractor:
Kiewit
