The 192,000-square-foot facility has parking for 443 cars, and a 17,360-square-foot subterranean plant with 3,000-square-feet of office space on the mezzanine level. The structural system is reinforced post-tension (beam and slab) concrete with one level below grade and three above grade.
Project Details
Local Office:
Los Angeles, California
Owner:
California Institute of Technology
General Contractor:
Morley Builders
